S.No Name of Employer Description of Work Value of Contract (in Cr)
1 RITES Limited Construction of 04 nos of Major bridges for rivers/nalas and 09 nos of RCC box bridges for proposed Railway Siding from Ch.00 to Ch37.15 km (between Nimarkhedi station and NTPC Khargone STPP (2X660 MW), Package-VII 76.24
2 PNC Infratech Limited Construction of Major Bridges, Minor Bridges, ROB, VUPs, PUPs, and Box Culverts between km60+000 to Km 76+300 … 81.19
3 Rail Vikas Nigam Limited Balance Works for construction of roadbed, major and minor bridges, track linking (excluding supply of rails, ordinary track sleepers, and thick web switches)… 144.56
4 RITES Limited Earthwork in formation, Construction of Bridges, P-Way Works, Road system Package for Tanda Thermal Project Stage-II(2X660MW) at Vidyutnagar… 111.68
5 PNC Infratech Limited Construction of Major & Minor Structures/Bridges and ROB between km.150.00 to 200.00 of Aligarh-Moradabad Road Project under NHAI. 74.09
6 Rail Vikas Nigam Limited Construction of Roadbed, Major Bridge and Track Linking work (excluding supply of rails and sleepers…) in connection with doubling between Mahadeokhedi to Malkhedi… 83.68
7 RITES Limited Supplying, laying & linking of P-Way Works including Earthwork in formation, Road Diversion Works, Shifting of Level crossings, Foot over bridges… 296.65
8 South East Central Railway Construction of foundation, substructure approaches protection work and other miscellaneous work including design for Bridge no. 86… 56.84
9 West Central Railway Construction of major/important bridges between Golapatti-Sagoni/Ratangaon from km 1161 to km 1175/30 in connection with 3rd line between Bina-Katni 61.09
10 West Central Railway Proposed construction of foundation and sub structure of important bridge (Sone Bridge span 16×45.7 M) at chainage 80304 M between Churhat and Sidhi stations… 71.60
11 PNC Infratech Limited For construction of Flyover, Minor Bridges, LVUP, PUP, VUP and Box Culvert on item basis between Chainage from km218.300 to Km246+500… 171.45
12 PNC Infratech Limited For construction of Major Bridges @ Ch.58+914 and 95+540, minor Bridge @Ch. 65+351, 106+730 & 98+215, ROB @ Ch. 64+100… 78.52
13 North Central Railway Construction of Road over bridges (ROBs – End to end including approaches) at 4 locations in lieu of LC no. 3C at KM 1086/11-13… 166.59