1 |
Rail Vikas Nigam Limited |
Construction of ROB’s / RUB’s and Major and important waterway Bridges for electrified new BG Railway Line between Mangliyagaon (Indore)- Budhni stations (198 km) between Ratlam and Bhopal Divisions of Western Railway and West Central Railway respectively in M.P. State, India in 2 (two) packages. |
380.00 |
2 |
Rail Vikas Nigam Limited |
Construction of road bed, minor bridges, platforms, buildings, switchyards, FOB etc and electrical (General) works in total 46.79 Kms (Package 2) in connection with doubling of Phaphamau – Janghai section on Lukhnow division of Northern Railway in the state of Uttar Pradesh. |
246.00 |
3 |
Bharat Heavy Electricals Limited |
Civil Works of Stage-I, II & III FGD System including LHP/GHP Facility at 3*200MW+4*500MW NTPC Korba FGD Project. |
57.31 |
4 |
Adani Road Transport Limited |
Execution of Road Works, Civil & Associated works on item Rate basis for Development of Six Lane of Badakumari-Karki section of NH-130-CD Road from km 204+000 to km 226+500(i.e Section II) under Raipur- visakhapatnam Economics Corridor in the state of Odisha (Package-OD-3) (Length 22.500 km). |
259.60 |
5 |
South Eastern Railway |
Composite work for Link line between Lodhma-Piska with Y connection by passing Ranchi & Hatia station Execution of Earthwork in Formation & Cutting including Construction of Minor & major Bridges, P. Way Linking Work with supply of Ballast,Construction of Service Buildings, Staff quarter, ORH, SRH offices, Platform & Passenger Amenities, Approach Roads, Slope protection work including S&T, Electrical Work & other related work from Piska station to Lodhma station & Y leg to Balsiring station end with loopline & goodsidings etc. of S. E. Railway. |
212.54 |
6 |
East Central Railway |
Balance Earth Work in embankment, Compaction,blsnketing, turfing construction of minor bridge, major bridge at KM 35.905(Span 3*30.5 m) and others associated work from Km 32.470 to 35.350 in connection with construction of new BG Rail Line from Koderma to Tilaiya jurisdiction of Dy. CE/C/DHN. |
58.45 |
7 |
IRCON International Limited |
Civil works including Earthwork for Railway Formation, Blanketing work, Minor Bridge, Major Bridge, ROB, RUBs, Track linking works(including supply of Ballast and Sleepers but excluding supply of Rails) for connectivity of Junadih Augmentation work & Dipka Siding to CEWRL Main Line in connection with the construction of New BG Electrified Double Railway Line for Chhattisgarh East West Rail Corridor from Gevra Road (Km 0) to Pendra Road (Km 135) in the state of Chhattisgarh over South East Central Railway. |
65.54 |
8 |
Central Railway |
Construction of Rail Fly Over at Sewagram for Wardha- Nagpur 3rd & 4th line and construction of RCC Box Subway 1/4.0*3.1 m by cut and cover method connecting platforms at sewagram station in connection with Wardha-Nagpur 3rd & 4th line. |
119.00 |
9 |
East Costal Railway |
Execution of earth work in formation, blanketing, minor bridges, drains, protection works & other allied works and construction of major bridges No. 287 (2×12.20 + 1×18.30 CG) from km 72.55 – Borraguhalu station (including) to km 82.75 – Karakaavalasa station (including) in connection with Kottavalasa-Koraput doubling project of waltair division, East central railway. |
71.63 |
10 |
East Costal Railway |
Execution of earth work in formation, blanketing, minor brisges, drains, protection works & other allied works and construction of major bridges No.121 (2×18.30 + 1×30.50 CG) & No. 136 (2×12.20 + 1×30.50 CG) from km 33.254- Baddavara station (including) to km 45.483 shivlingapuram station (including) in connection with Kottavalasa-Koraput doubling project of waltair division, east central railway. |
57.50 |
11 |
PNC Infratech Ltd. |
Construction of six lane upgradable to eight lane of kanpur lucknow expressway including spur from km 28+500 to km 73+400 in the state of uttar pradesh on hybrid annuity mode under bharatmala pariyojna (Package-2). |
155.00 |
12 |
IRCON International Limited |
Construction of 4 Nos of major bridge & 6 Nos. of ROBs from (- ) 0.700 Km to 27.65 Km between Kathautia and Ichhak Khurd in connection with the construction of Shivpur-Kathautia New BG Electrified Rail Line in the State of Jharkhand ( Pkg-V). |
139.47 |
13 |
Western Railway |
Civil Engineering work of doubling of track in mid sections between Dalauda (km 305.15) to Ratlam (km 374.46) station of ratlam division of western railway in connection with Nimatch- Ratlam doubling project on EPC mode. |
211.00 |
14 |
National Highway authority of India |
Additional Work (2VUPs, MR-10 junction flyover and service road) in Six lane Indore-Dewas Section of NH-52 in the state of Madhya Pradesh on EPC Mode. |
162.25 |
15 |
RITES Limited |
Cosntruction of ROB (1×48.0 mtr) BOW string girder as super structure resting on pile foundation including its both approches and general electricle works in connection with detailed engineering (DE) & project management consultancy (PMC) for the work of construction of new railway siding at kusmunda opencast of kusmunda area, Dist- Korba, Chhatisgarh. |
66.71 |
16 |
National Highway authority of India |
Construction of 6-Lane Durg-Raipur-Arang bypass section of NH-53 design ch. 0+000 (Vill.- Tendesara) to design ch. 44+500 (vill. Parsada) in the state of Chattisgarh on EPC mode under Bharatmala project (Package-A). |
372.81 |
17 |
Bharat Aluminium Company Limited |
Supply & execution of (phase 1 & 2) work inside & outside BALCO Plant preminses for augmentation of exsting rail system serving BALCO Plant. |
120.56 |
18 |
PNC Infratech Ltd. |
Construction of Station Building and service building, plateforms (HL), water supply system, drainage, Sewerage, Rain water harvesting (R.W.H.) ROB, Syphone, RUB/ROR (U-Slab, open web girder box type), Subway (RCC box culvert, pipe culverts, retaining walls, Tow wall & Chute drain etc between CH. 29+680 to 49+700 (Section-I) under shceme A & B of agreement between PNC & HORCL. |
146.91 |
19 |
Western Railway |
Construction of major Bridge foundation, substructure and super structure including steel Girder as per Railway’s approved designe and drawing and other incidental miscellaneous work etc, betwen Dhar (Excluding)-Amjhera (including) Total 16 Bridges in connection with Dahod-Indore New BG Kine Project Of Ratlam Division of Western Railway. |
48.71 |
20 |
West Central Railway |
Construction of ROB Span 1×36.00 m Composite Girder + 1×18.00 m Composite Girder including both side Appriach, RE Wall, Diversion of Road and other ancillary work at CH: 74497.00 m of Satna Panna New line in Connection with LAR-SGRL New BG Line Project. |
40.00 |
21 |
West Central Railway |
Construction of 1 Nos. Road Over Bridge (ROB-Composite Girder) and 7 Nos. Road Over Bridge (ROB-RCC BOX) including sub structure, super structure, RE wall cinstruction in approaces, Road work and other miscellaneous work in Sidhi-Gajrahi section up to Gopad River (km 100.00 to 123.00) in connection with Sidhi-singrauli New BG Rail Line Project. |
110.00 |
22 |
North Central Railway |
Construction of Viaduct including ROR over main linetrack, RFO over expressway, Major/Minor bridges on pile/open foundation, fabrication, supply and launching of steelgirders from RDSO approved firms, Formation works,P.way works, building works and other allied works near Etawah Railway station in c/w Construction of Etawahbypass in Prayagraj Division of North Central Railway. |
300.00 |
23 |
Western Railway |
Construction of various Major Bridges including misc. Works like pitching, toe wall, floor protection and other misc. Works required for successful completion of work between Nliya to Vayor in connection with New BG line between Naliya-Vayor section of Ahmedabad Division on Western Railway. |
48.31 |
24 |
West Central Railway |
Construction of Steel Foot OverBridge (3.66m wide) including foundation and roofsheeting at Karhi, Barethiya, Nagod, Devendranagarand 6.0m wide FOB at Panna and provision of sidepathway in Major Bridge No. 15, 32 etc. in connectionwith Satna-Panna New Line Project. |
28.22 |
25 |
West Central Railway |
Construction of 1 Nos. Road Over Bridge (ROB-Composite Girder) and 2 Nos. Road Over Bridge (ROB-RCC BOX) including sub structure, super structure, RE wall cinstruction in approaces, Road work and other miscellaneous work in Panna-Khajuraho Sexction (Km 74.550-80.00 and Km 105.00-130.00) in connection with Panna-Khajuraho New BG Rail Line Project. |
34.00 |