• RITES LIMITED

    S.No. DESCRIPTION OF WORK COST OF WORK (IN CRORES)
    1. Supplying, Laying & Linking of P-way works including Earthwork in Formation, Road diversion works, Shifting of level crossings, Foot over bridges Station Building, Platform, Rail over Rail Flyover, Minor Bridges, Locoshed, Internal and External Electrical Works and other allied Works from Hamirpur Road Station (North Central Railway) (DRAIPL-MBPL JV) 256.84
    2. Earthwork in formation, Construction of Minor and Major Bridges and other Miscellaneous works from Ch. Km 0/000 (Etah railway Station) to 8/700 in connection with Construction of Railway siding for JVUNL, Jawaharpur TPP (2X660 MW), District: Etah, State Uttar Pradesh Package-1 69.72
  • RAIL VIKAS NIGAM LIMITED

    S.No. DESCRIPTION OF WORK COST OF WORK (IN CRORES)
    1. Construction of road bed, major and minor birdges and track linking work (excluding supply of rails and sleepers, thick web switches and special sleepers) in connection with doubling between Mahadeokhedi to Malkhedi on Bhopal and Jabalpur division of WCR in Madhya Pradesh, India 56.00
    2. Construction of ROB’s , Road under bridges and majour bridges for electrified new BG railwa line between mangalia gaon (Indore)- Budhni staion’s (198 Kms) between ratlam & Bhopal division of WCR in the sate of MP. (Package 1)- New Work 304.22
    3. Const. of roadbed, minor bridge, plateform, building, switchyard, fob etc. and electricle work in connection with the doubling of Phaphamau-Jhanghai section on lucknow decision of NCR in the state of Uttar Pradesh. – New Work 207.27
  • PNC INFRATECH LIMITED

    S.No. DESCRIPTION OF WORK COST OF WORK (IN CRORES)
    1. Construction of eight lane access-controlled expressway starting from junction with NH – 47 near Bhamalya village and ending at junction with SH-175 in Baletiya village in Panchmahal district (Ch: 780+920 to 803+420 ; design Ch: 328+500 to Ch: 351+000) Section of Delhi – Vadodara greenfield alignment ( NH -148 N ) on EPC Mode under Bharatmala Pariyojna in the state of Gujarat. 66.00
    2. Four laning of Jagdishpur -Faizabad section from km 47.930 (Design Chainage km 47.600) to km 107.680 (design chainage km 108.020) of NH -330A in the state of Uttar Pradesh on Hybrid Annuity Mode under NH (O) 61.00
    3. Construction of six lane road starting from Chakeri (Kanpur) ending at Allahabad junction of EPC mode in the state of UP for NHAI 10.85
    4. Devlopment of Purvanchal Expressway (Package -VI) from Govindpur (Dist. Azamgarh) to Mojrapur (Distt. Azamgarh) (Km. 218+300 to Km. 246+500) in the state of Uttar Pradesh on EPC Mode 165.76
  • WEST CENTRAL RAILWAY

    S.No. DESCRIPTION OF WORK COST OF WORK (IN CRORES)
    1. Construction of major /important bridges between Sagoni/ Ratangaon -Katni Murwara [from km 1175/3 to km 1235.35] in connection with 3rd line between Bina-Katni. (GPT-MBPL JV) 65.08
    2. Constn. Of major /important bridges between Golapati-Sagoni/Ratangaon(deom Km 1161 to km 1175/30) in connection with 3rd line between Bina-Katni. 52.00
  • EAST CENTRAL RAILWAY

    S.No. DESCRIPTION OF WORK COST OF WORK (IN CRORES)
    1. Earthwork in Embankment compaction, blanketing turfing construction of Minor Bridge major bridge Km. 26.123) RUBs FOBs and other associated works from Ch. 24.4 Km. to 32.405 (Excludining Tunnel in connection with construction of new BG rail line from koderma to Tilaiya under jurisdiction of Dy. CE/C/DHN (MBPL-KLD JV) 90.99
    2. Supply Stacking & Spreading of Stone Ballast, Linking of P-Way including Transportation of P-Way material like rail sleeper fittings etc. and other associated work as per railway specification and standared between Obra Km. 138.900 (Excluding Yard) in connection with doubling between Ramna and Singrauli under Dhnbad Division (MBPL-KLD JV) 18.76
    3. Supply, Stacking and Spreading of stone ballast, linking of permanent way including transportation of P.Way materials like Rail, Sleeper, fittings etc. and other associated works as per Railway specification and standard between km 15.400 to Shaktinagar (Including Yard) in connection with doubling between Karaila Road and Shaktinagar under Dhanbad Division of ECR 18.55
    4. Supply, Stacking and Spreading of stone ballast, linking of permanent way including transportation of P.way linking of Permanent way including transportation of P.way materials like Rail, Sleeper, fittings etc. and other associated works as per Railway’s specification and standard between Km.157.500 (Excluding KDRD Yard) and Km.175.000 (Excluding Karaila Yard) in connection with doubling between Ramna and Singrauli under Dhanbad Division 17.48
    5. P.way linking,supply and spreading of stone ballast, supply of P.way materials and other P.way ancillary works between km 38.287 to km 64.500 including Biharsharif, Asthawan and Barbigha-yards in connection with construction of New B.G. line between Biharsharif-Barbigha. 34.38
    6. Earth work in cutting, filling blanketing,turfing,construction of major & minor bridges, Limited Height Sub-way, Height Guage, Retaining wall, Drain, S & T buildings, water supply arrangements, approach road, supplying and fixing various Board, Land Boundary pillars, bridge inspection steps, and other associated sorks as per Railway’s specification and standards for construction of ROR line to avoid surface crossing at Garhwa Road Station By ROR under jurisdiction of DY.CE/c/BRKA. 76.67
    7. Supply, Stacking and Spreading of Stone ballast, linking of Permanent way including transportation of P.way materials like Rail, Sleeper, fittings etc. and other associated works as per Railway’s specification and standard between Km. 1.500 to 15.400 in connection with doubling between Karaila Road and Shaktinagar under Dhanbad Division of ECR. 19.56
  • SOUTH EAST CENTRAL RAILWAY

    S.No. DESCRIPTION OF WORK COST OF WORK (IN CRORES)
    1. Construction of foundation, substructure, approached, protection work and other miscellaneous work including design for bridge no. 86 (1×12.2 m + 9×30.5m +1×12.2m) with pile foundation at km 609/23-610/13 Br.no. 71 (1×18.3m + 1×12.2m) at km 624/23-25, Br. no. 69 (4×18.3m) at km 633/3-7, Br. no. 66 (4×12.2m) Br. no. 59 (4×12.2m) at km 642/1-3, Br. No. 54 (5×18.3m) at km 654/19-21 between Bhupdeopur-Saragaon Station, in connection with Bilaspur-Jharsuguda 4th line project. 62.51
  • CENTRAL RAILWAY

    S.No. DESCRIPTION OF WORK COST OF WORK (IN CRORES)
    1. Track work in section -III (kms. 145.00 to 216.00) in connection with Pune -Miraj Doubling project. (NRK-MBPL-JDB JV) 68.08
    2. Laying & Linking of BG track from Km 475.450 to Manmad (i.e. Yeola to Manmad) including remodelling of Yards and MMR entry aggangement in connection with Daund- Manmad Doubling 12.29
    3. Laying & Linking of BG track from Km 276.50 to km 352.00 (i.e. Kashti to Ahmednagar) with remodelingof Yards in connection with Daund- Manmad Doubling project 25.61
    4. Laying & Linking of BG track from Km 392.50 to km 463.00 (i.e. Padhegaon to Kopargaon) including Yards remodelling in connection with Daund- Manmad Doubling project. 22.22
  • NORTH CENRTAL RAILWAY

    S.No. DESCRIPTION OF WORK COST OF WORK (IN CRORES)
    1. Constn. Of major bridges (16 Nos. & Earthwork in approaches, including protection and other ancillary works in Lalitpur-Jhansi Section (89.91 Kms) in connection with Bina-Jhansi 3rd lime Project (Zone-B) : (GPT-MBPL JV) 90.99
    2. Construction of Road over bridge (ROBs-End to end including approaches) at 4 locations in lieu of LC no.. 3C at KM 1086/111-13, LC no. 6C at KM 1049/9-1.LC No. 9C at KM 1103/11-13 & LC No. 10/C 3E at KM 1105/11-13 on CNB -ETW section in PRYJ Division NCR 111.37
  • SOUTH EASTERN RAILWAY

    S.No. DESCRIPTION OF WORK COST OF WORK (IN CRORES)
    1. Construction of Foot Over Bridge and other Allied Works at Sonakhan Yard, Sogra Yard & at the Yard between Dhutra to Sonakhan station including Metallizing works of FOB & Other steel structure works between Rourkela to Dhutra station in connection of 3rd Line Work between Rourkela to Dhutra station in connection of 3rd Line Work between Rourkela – Jharsuguda under the Jurisdiction of Dy. Chief Engineer (Con-I), Rourkela of S.E. Railway. 25.63
  • BHEL

    S.No. DESCRIPTION OF WORK COST OF WORK (IN CRORES)
    1. Civil work of Stage-I, II & III FGD System including LHP/GHP Facility at 3x200MW + 4X500MW NTPC Korba FGD Project. 65.03
  • MRIDC

    S.No. DESCRIPTION OF WORK COST OF WORK (IN CRORES)
    1. Construction of Road Over Bridges ROBs at 5 Locations i.e. Pune-Miraj Section at LC No. 47- km 122/8-9 between Wathar-Palsi Stations, LC No. 81 – km 166/4-5 between Koregaon-Targaon Stations, LC No. 112 – km 239/1-2 between Takari-Kirloskar Stations, LC No. 117 – km 253/0-1 between Bhilavdi-Nandre Stations and LC No. 119 – km 256/6-7 between Bhilavdi-Nandre Stations in Lieu of LC Gates in Maharashtra area on Pune Division of Central Railway. 46.79
    2. Construction of Road over Bridges ROBs at 7 Locations (Amla Nagpur Section at LC No 282 Km 978/11-13, LC No 282B-km 981/13-15 between Kalambha-Katol Stations, LC No 290 – Km 1020/23-25 & LC No 290B – km 1025/24 betweemn Kamleshwar – Bharatwada – Godhani Stations) in lieu of LC Gates in Maharashtra area on Nagpur Division of Central Railway 111.51
  • IRCON INTERNATIONAL LIMITED

    S.No. DESCRIPTION OF WORK COST OF WORK (IN CRORES)
    1. Assembling, laying & linking of Railway track for main lines and loop lines with contractors own P-way Material ( Except rails, sleepers & ballast) on spur line between Gharghodha (km 1.315) and Bhalumuda (km 14.425 ) Section. 37.79
  • KONKAN RAILWAY CORPORATION LIMIED

    S.No. DESCRIPTION OF WORK COST OF WORK (IN CRORES)
    1. Complete Track Renewal (P) between km. 693/000 to 739/800 UDUPI (UD)-THOKUR (TOK) in AEN/Udupi Section in Karwar region over Konkan Railway, Karnataka State 18.69
  • ADANI ROAD TRANSPORT LTD

    S.No. DESCRIPTION OF WORK COST OF WORK (IN CRORES)
    1. Execution of Civil & associated works for Development of Six Lane Badakumari – Karki Section of NH-130-CD Road from km 204+000 to km 226+500 under Raipur – Visakhapatnam Economics Corridor in the state of Odisha on Hybrid Annuity Mode (Package-OD-3). (Length 22.500 km) 285.60