• SOUTH EAST CENTRAL RAILWAY

    S.No. DESCRIPTION OF WORK COST OF WORK (IN CRORES)
    1. Execution of earth work in formation between ch. 100 to 5050 (ch. Starts form CSB of Vinaiki) and construction of minor bridge No.2 (66.1X3.5m RCC Box) at ch.1983m ROB no. 4(1×21.0m RCC T beam girder) at Ch. 4002m & two Nos. aqueduct at ch. 3853 & ch.4464 along with other allied and miscellaneous works between ch.100 to 5050 in Vinaiki – Shikara section in connection with Gondia – Jabalpur gauge conversion project. 24.34
    2. Execution of earth work in formation between ch. 5050 to 7100 (ch. Starts form CSB of Vinaiki station) and construction of minor bridge aqueducts, siphon along with other allied and miscellaneous works between Vinaiki – Shikara section in connection with Gondia – Jabalpur gauge conversion project. 13.96
    3. Execution of all balance civil works to make section fit for commissioning except ballast supply, track linking and building works in between Shikara (Including) – Ghansore(Including) section (approximate 22 Kms) in connection with Gondia – Jabalpur gauge conversion project. 42.14
    4. Construciton of pile foundation, Sub-Structure, approaches including allied and miscellaneous works for major bridge no. 182 (2×12.2m + 9×45.7m) between IB and Brijrajnagar stations in connection with construction of JSG-BSP 4th line. 23.84
  • RAIL VIKAS NIGAM LIMITED

    S.No. DESCRIPTION OF WORK COST OF WORK (IN CRORES)
    1. Railway track linking, supply, CMS crossing (exeluding supply of Rails, sleepers) including supply of special sleepers, SEJs and supply of ballast etc. for Dallirajhara – Dondi section (17.00km) in connection with a new Rail link between Dallirajhara and Rowghat in Raipur division of South East Central Railway in the state of Chhattisgarh, India. 22.37
    2. Balance works for cinstruction of roadbed, major and minor bridges, track linking (Excluding supply of rails, ordinary track , sleepers and thick web switches) outdoor signalling and electrcile (general) works in connection with doublng of Akalkot road-Gulbarga section( 78 kms) of Hogi-Gulbarga section in solapur division of centra railway in the state of Maharashtra & Karnataka, India (Project Value 313 Crores- MBPL Portion 37%). 143.62
  • RITES LIMITED

    S.No. DESCRIPTION OF WORK COST OF WORK (IN CRORES)
    1. Bridge, Buildings, Workshop and associated Electrical works for Railway siding and MGR System of NTPC, Vindhyachal, Stage-IV, (Package-3), Vindhya Nagar, Distt. Singrauli, State: Madhya Pradesh. 45.17
    2. Earthwork in Formation, construction of Bridges, P-way works and other miscellaneous works in connection with balance work of KBJ Rail Line between Krishnashila and Shaktinagar Stations of E.C. Railway of Khadia Project of NCL, Distt.: Sonebhadra (U.P.) 31.28
    3. Construction of Road over Bridge for Traffic Facility by PWD Dept Raipur (C.G.) in lieu of L-“XING” No. 424-B (Gondwara Gate) between URK-SZK bye pass line at km. 827/28. B (827.918)at Raipur CG. 26.33
    4. Construction of 4 Nos Major Bridge for rivers/Nalas and 09 Nos of RCC Box bridges for praposal railway siding from Ch. 00 to Ch. 37.15 km (Between  Nimarkheri Station and NTPC Entry gate) for proposed Railway siding for NTPC khargone STPP (2X660MW) Package VII. 76.24
    5. Earthwork in Formation, Constrcution of bridges, P-Way works, Building, Electrical & other miscellaneous work in connection with P.R. siding at Gorbi-Block B Project of NCL Gorbi work. 48.81
    6. Earthwork in Formation, Construction of Bridges, P-Way works, Building works, Road works and other ancillary works in connection with construction of coal transportation system Package for Tanda Thermal Power Project Stage-II (2×660 MW) at Vidyutnagar, Distt.: Ambedkar Nagar, Uttar Pradesh (Package-1) 111.68
  • WEST CENTRAL RAILWAY

    S.No. DESCRIPTION OF WORK COST OF WORK (IN CRORES)
    1. Construction of important bridgr at Dhasan river of span 13*30.50 m pre-stressed concret girder and ancillary work in connection with Lalitpur-Khajurahoi new BG rail lime project. 26.54
    2. Contruction of 3 majour bridges no3 9 (4*18.30), 18 (2*18.3 m) and 19 (18.3+5*30.5) PSC grider/box and ancillay work in connection with PMA-BPL new BG rail line project . 31.40
    3. Construction of three road over bridges in lieu of leve; crossing no. 82 (Ramganjmandi-Morak) at km 849/14-16, no. 180 (Gangapur city-Choti udai) at Km 1098/8-10 and 252/B (Jaghina-Jajanpatti) at Km 1222/6-8with all ancillary portion work on nagada-mathura section of Kota Devision 17.77
    4. Proposed construction of foundation and sub structure of important bridge (Sone Bridge span 16×45.7 M) at chainage 80304 M between Churhat and Sidhi stations in connection with Rewa – Sidhi New B.G. Rail Line Project. (Two packet) 71.07
    5. Construction of major and minor bridge, RUB, U type PSC “U” Girder bridge 18.3M, 12.20M Span and 9.15m, 6.1m, 4.75m, 3.66m, 3.05m span PSC Slab and 2.44, 1.83,1.22,0.915, 0.61 m Span Pre cast RCC Slap ( All RDSO Drawings) at Bridge 984/1, 1197/2,1199/2,1204/1 and for other bridges and Ancillary work in connection with Bina-Katni 3rd line project. 10.75
  • PNC INFRATECH LIMITED

    S.No. DESCRIPTION OF WORK COST OF WORK (IN CRORES)
    1. Contsruction of four laning works (Structur only) for Ghajiabad-Aligarh section of NH-91 from Km 84.000 to Km 12.0690 & 33.0 KM to 41.0 KM in th state of of Uttar Pradesh (Package no ST-4&5) (Cement and steel supplied by PNC free of cost) 50.14
    2. Construction of Fly Over at Agra Link Road at Ch. -l+850 Minor Bridge at Ch. 10+400 and other structures including VUPs PUPs, and Box Culverts between Ch. -2+634 arld Ch. 16+000 of Agra Lucknow Expressway of 8 Lanes Under Uttar Pradesh Expressways Industrial Devlopement Authority 51.71
    3. Devlopment of jaora – Nayagaon Section from Km. 125.000 to Km. 252.00 on SH 31 to 4 lane in the state of Madhya Pradesh -Sub contract works for ROBs in Km. 131 & 156 and other structural works. 12.63
    4. Construction of Major & Minor Structures/ Bridges and ROB between Km. 150.00 to 200.00 of Aligarh Moradabad Road Project under NHAI 62.06
    5. Four laning of Jhansi -Khajuraho Section (Pkg-2) from km 76.3 to Km 161.7 of NH -75/76 in the states of MP and UP under NHDP Phase III on Hybrid Annuity Mode 10.98
    6. Construction of Major Bridge , Minor Bridge,VUP,PUP,LVUP and Box culverts between km. 60+000 to km. 76+000 of NH-75/76″ Four laning of Jhansi – Khajuraho section (pkg-1) of from km. 76.3 (existing km. 106.300 of NH-25 Kanpur -Jhansi section to km.82.10) of NH-75/76 in the State of UP/MP” 78.80
  • INDUSTRIES

    S.No. DESCRIPTION OF WORK COST OF WORK (IN CRORES)
    1. Devlopment of Mines of prism cement ltd and hiring of dozer at prism cement ltd. at Mankahri Satna (M.P.) 83.01
    2. Handling of material for Prism cement lt.d , Satna 26.90
    3. Extention of private railway siding at Prism cement limited, satna 11.96
    4. Contruction of Railway siding for Jhajjar Thermal Power project(2*660 MW) at Plant site village-Khanpur, near Jharli railway station, tahsil-Matenhail, Disctt : Jhajjar, Haryana 14.38
    5. Addtion and alteration of railway siding facility for cement grinding unit at M/S Diamond cements imlai dist. Damoh 5.30
    6. Execution of earthwork in formation, construction of bridges, p-way works in connection of railway siding from Turki road railway station to JRC plant at Jaypee Nagar, Rewa 15.50
    7. Construction of Railway Siding at Patliputra Cement works of Ultrtatech Cement Ltd. 22.57
  • SRCP

    S.No. DESCRIPTION OF WORK COST OF WORK (IN CRORES)
    1. Construction of majour bridges, ROB’s and RUB’s for New Bg railway line between surajpur railway station & Rananunagar in south east central railway for sarguja ril corridor project Phase-I in the state of Chattisgarh. (Cement & Steel supplied by SCPL free of cost) 16.20
  • OTHER INDUSTRIAL PROJECTS AND MISC. WORKS

    S.No. DESCRIPTION OF WORK COST OF WORK (IN CRORES)
    1. Civil construction of Clinker Soli at raibareli (U.P.) the Vice president -Project, Birla Corporation limited, Kolkatta (W.B.) -Cement & Steel supplied by BCL free of cost. 4.40
    2. Civil & Structural works at Maihar cement plant, Maihar satna (M.P.) -Cement & steel supplied by BCL free of cost 11.48